
www.velodyne.com
6 -SC-IW Installation Manual
Step 3 - Route Wire
Route the wire from the location where the electronics gear is located to where the SC-IW will be. There is
“extra space” between the studs and the back box in the event that the wire has to pass along the side of the
back box to the driver module.
Figure 3: Route Wire
Step 4 - Cover Rubber Couplings
If the installation is not going to be nished right away, Velodyne recommends “taping” or otherwise “covering”
the two connecting tubes to prevent paint, drywall and/or foreign objects from entering the back box.
Comentarios a estos manuales